Condition of the orifice plate.
SERVICES
CRT Measurement Services cleans, inspects and recertifies orifice meter tubes at your meter station or in our shop, and reports on every tube we inspect.
Even a well-installed orifice meter with good flow conditioning collects build-up over time. Deposits on the tube wall, the fitting or the flow conditioner change the flow profile and can cause significant measurement error.
Regular cleaning and inspection keeps the meter run within its requirements and finds installation problems before they cost you measurement.
On site, CRT technicians arrive equipped to open the meter sections, clean and inspect the orifice fitting and the upstream and downstream tube sections including flow conditioners, and make needed repairs. We can supply and install new gaskets, studs and nuts and insulation kits, put the tube back in line and torque the flanges. Wastewater is collected and contained for the customer's disposal. Videoscoping can save the time and cost of removing a tube.
In our shop, we tear down and rebuild orifice meter runs, clean and hone the tubes, repair defects such as eccentricity, and inspect each run against API 14.3 (AGA Report No. 3), with before and after photos.
Every meter tube we recertify is checked for the following, and the operation of the orifice fitting is verified.
Condition of the orifice plate.
Tap hole communication, tap hole diameter, and tap location relative to the orifice plate face.
Whether the plate seal protrudes into the bore.
Roughness of the tube wall.
Seat gap and the eccentricity of the plate in the tube.
Site checklists, an inspection report for every meter tube, and a written list of any tube that did not pass recertification with the reason why.
Tell us how many meter runs, their sizes and locations, and whether you want the work on site or in our shop, and we will respond with a firm price and an honest schedule. Email rfq@crt-ms.com or call (832) 769-4135.